- 01
Stage 1 of 6: First conversation
A call or meeting about the space, how you use it and what isn't working. We talk about scope and a comfortable budget range, and agree whether a site visit is the right next step.
You receiveA summary of what we heard · A proposed next step
You approveWhether to go ahead with a site visit
Led byDesign lead
ThenSite visit & measurement
- 02
Stage 2 of 6: Site visit & measurement
We measure every wall, opening and service point, photograph the space and check what can and can't move. This is where most surprises are found — before they cost anything.
You receiveMeasured drawings of the space · Notes on constraints
You approveThe brief the design will answer
Led byDesign lead and site lead
ThenDesign & 3D
- 03
Stage 3 of 6: Design & 3D
Layouts first, then 3D views and material samples you can hold. We revise together until the plan, the look and the estimate all agree.
You receiveLayout drawings · 3D views · Material and finish samples · An itemised estimate
You approveFinal design · Materials and finishes · Estimate
Led byDesign lead
ThenProduction
- 04
Stage 4 of 6: Production
Joinery is made from the approved drawings. Site work — electrical, plumbing, civil — is scheduled so the room is ready when the joinery is.
You receiveA written schedule · Progress updates at agreed points
You approveAny change, in writing, before it is made
Led byProduction and site leads
ThenInstallation
- 05
Stage 5 of 6: Installation
Fitting on site: carcasses levelled, doors aligned, worktops templated and fixed. The site is kept clean and protected each day.
You receiveA daily summary of what was done
You approveSnag list walk-through
Led bySite lead
ThenHandover
- 06
Stage 6 of 6: Handover
We walk through every door, drawer and fitting together, fix anything outstanding and explain how to look after each finish.
You receiveCare guide for your materials · A record of what was installed
You approveHandover sign-off
Led bySite lead and design lead